Creative Communities of the World Forums

The peer to peer support community for media production professionals.

Activity Forums Apple Final Cut Pro Legacy workflow for a really long feature

  • workflow for a really long feature

    Posted by Lia Martinez on January 23, 2006 at 5:24 pm

    hey everyone —

    I’m in the middle of editing what will be a 20-hour movie (my estimate). It is being shot in DV 24p advanced.
    I’m extremely concerned about keeping my system stable with the massive amount of footage that needs to be
    edited (right now I’m halfway through it and my 500g LaCie is almost full).

    Opening up the project file now takes a minute or two so I’m getting concerned and paranoid. I just want to know
    if anyone can give me any advice on how to manage all this footage, and any safety measures I may be missing out on.

    Right now I:
    1. Keep my project files in my system drive (separate from media drive) and back it up regularly
    2. Separate the film into 2-hour sequences and edit with one sequence at a time open
    3. Repair permissions, verify disk, etc regularly
    4. maxed out the RAM capacity in my powerbook (I have 2 gig)

    should I start dividing the film into separate projects (instead of sequences within the project)? the tapes have footage from all parts of the film though
    so I am not sure how this is possible. Unless its okay that I open a sequence with the sequence’s media in another project?

    Anyway, any help would be greatly appreciated 🙂 I’m sure you guys can feel my paranoia, I just want to make sure
    that I have all the bases covered.

    thanks in advance.
    lia

    Lia Martinez replied 20 years, 7 months ago 5 Members · 8 Replies
  • 8 Replies
  • Bouncing Account needs new email address

    January 23, 2006 at 5:43 pm

    First thing I’d do is GET IT ONTO A DESKTOP MACHINE.

    A 20-Hour feature on a Powerbook seems a bit too much.

  • Lia Martinez

    January 23, 2006 at 6:05 pm

    haha I know. Can’t have it all though.

  • Aaron Neitz

    January 23, 2006 at 7:27 pm

    1) make sure you’re on FCP 5 – 4.5 wasn’t good with huge projects

    2) GET OFF THAT LACIE! You’ll find multiple threads in here about those Lacie Big disks burning out and failing on people. We’ve lost 2 of the same model you’re using.

    3) Break off the film into 1 hour cuts if you can (maybe even a project file that’s just the digitized footage, and open subsequent projects for each reel. Keeping the project with the media open concurrently to pull from it). We’re working on a 1.5 hour feature, the project file is around 230 MBs, and takes 5-7 minutes to load on a maxed out G5/XRaid setup. It’s also starting to slow down (like 4 seconds to delete a clip). But it IS stable. Deleting old cuts/sequences of the reels speeds it back up. It’s almost like every little event or object needs some allocation in RAM, even if it isn’t open or being used.

  • Frank Nolan

    January 23, 2006 at 7:38 pm

    >I’m in the middle of editing what will be a 20-hour movie (my estimate).

    Geez and I thought King Kong was long at just over 3 hours!

  • Kevin Monahan

    January 23, 2006 at 7:38 pm

    A 20 HOUR long film? Holey moley. I saw like a 12 hour one about Jerusalem once. You had to go on 3 different days to see the whole thing.

    A Keep your project lean and mean. Blow away any media you definitely will not use. You may want to have a separate project with all your selects, and then bring in only the ones you need to your main project.

    Probably too late, but capturing small clips (scene and take) instead of entire tape rolls makes for a snappier timeline. Unfortunately, most people capture entire tape rolls and seek time on the drive slows.

    Kevin Monahan
    Take My FCP Master’s Seminar!
    fcpworld.com

  • Lia Martinez

    January 24, 2006 at 1:00 am

    hey thanks, I think I’m going to sell the lacie and buy a g-raid (if I find one over here).

    I was thinking about creating a project that is all media and editing a sequence in another project but I wasn’t sure if it
    would hold, but I’ll try it now since I have your testimonial.

    Thanks again!

  • Lia Martinez

    January 24, 2006 at 1:02 am

    I still have half of the footage left to capture, so I’ll try that. Thanks!

  • Lia Martinez

    January 24, 2006 at 1:05 am

    this is definitely a long one. the first 5 hours already screened in torino, italy. I’m hoping the other 15 hours dont crash and burn in my humble set-up. thanks for all the help everyone, I really appreciate it.

We use anonymous cookies to give you the best experience we can.
Our Privacy policy | GDPR Policy