-
How does Premiere treat clips ‘below’ others on the timeline during export?
Hello everyone,
Exporting out a 35 minute 4K timeline and I’ve got multiple angles I’ve been cutting between. I’m curious how Premiere treats the clips underneath the main timeline. I assume they’re ignored completely but, would render times go down if I was to disable all the clips I didn’t use? Would this have any bearing on file size?
Charles Ferran
http://www.charlesferran.com\”Far better is to dare mighty things, to win glorious triumphs, even though checkered by failure than to rank with the poor spirits who neither enjoy much, nor suffer much because they live in a gray twilight that knows no victory or defeat.\”
