Activity › Forums › Adobe Premiere Pro › Cut between 2 camera angles at regular intervals like CCTV loop
-
Cut between 2 camera angles at regular intervals like CCTV loop
Posted by Rory Beard on October 24, 2016 at 3:53 pmEdit so the camera angle switches every 30 seconds.
Looking for a repeat edit to perform over 50 hours of footage.
Rory Beard replied 9 years, 10 months ago 3 Members · 6 Replies -
6 Replies
-
Tero Ahlfors
October 24, 2016 at 4:19 pmI believe a timeline can be 24 hours max because that’s the amount of time you can express with a standard timecode.
-
Rory Beard
October 24, 2016 at 4:39 pmHi Dave
I will be implementing it over 1 hour sections at a time.
Just doing that 50 times I figured there must be a way to implement it once and then copy the format into the next video.
Rory
-
David Roth weiss
October 24, 2016 at 5:01 pmSounds like an exercise no one will ever watch… What’s the purpose?
David Roth Weiss
Director/Editor/Colorist & Workflow Consultant
David Weiss Productions
Los AngelesDavid is a Creative COW contributing editor and a forum host of the Apple Final Cut Pro forum.
-
Rory Beard
October 24, 2016 at 5:26 pmHi David,
The purpose is to re-show CCTV footage at real time as if the filming was happening right there and then.
Rory
-
Rory Beard
October 24, 2016 at 5:54 pmHi Dave
I think your solution is indeed the only one!
Thanks
Rory
-
Rory Beard
October 25, 2016 at 3:12 pmHi Dave,
I used your technique:
Sync up 2 hour-long clips; lock the bottom clip.
Every 30 seconds split the top clip with the razor tool
Delete every other section of the top clip.THEN
I copied and pasted the split, top clip over the top of my next video and whilst it was still selected pressed delete.This made all the splits instantaneously!
THANKS FOR THE HELP
Rory
Reply to this Discussion! Login or Sign Up