-
Receiving 100fps footage from client, need a 24 or a 30fps final product
Hey all, sorry if this is a newb question, learning as I go here and on a time crunch! Using Premiere Pro CC on an i7 iMac with 16 gigs of ram
I will be editing a 90 second spot for a client, they filmed all their footage at 100fps to aid with time effects which I will need to use every so often.
For shots where I don’t require the 100 fps, if I set up my project and sequence at either 24 or 30, will I be able to drop cuts into my sequence and have it be normal? or will I need to do some sort of massive duplication and conversion up front.
Thank you SO MUCH in advance!