-
Interpret Footage Changes In & Out Points
Hi,
So we’ve been working on project all shot at 60P, to be interpreted to 25P.
We make timelines of footage as banks to pull from, so in/out points are added in the source window, then dragged to layout sequences.
The assistant editor forgot to interpret a load of footage before making these in/out points, so all footage has been logged and dropped onto these timelines at 60P.
If I now batch interpret all the clips in the bin to 25P, it keeps the in/out points in terms of timecode, so the clips stretch, but the in/out points stay in the same place (time-wise).
Is there a way to make them stick to frame rather than time? Otherwise he will need to screengrab and redo all points and timelines clip by clip…
Thanks,
D