-
Keeping connected clips in sync when replacing primary storyline
OK…whomever helps me with this one, I owe big time. I am trying to replace my primary storyline with a new version of itself (added a few things to it). I moved the updated clip to the secondary storyline. I would now like to replace the primary storyline (UptoLehman) with the secondary storyline (UptoLehman2) yet still keep all the audio/music clips in sync.
Is this possible? This is where FCP X was supposed to shine…and maybe it can…but it’s been frustrating me to all get out. Without a solution, I have to go back and re-tweak all the audio for the rest of the piece. Pretty much a huge pain.
Thx so much.
