-
Premiere Pro 5.5 and fps question
Hi All
I am struggling to get my head round varying fps in a single project. I have watched numerous tutorials on how a premiere project can be set to match the settings, including frame rate, that the original footage was shot at – and easily achieved by dragging the clip to the new sequence button which automatically chooses the appropriate sequence settings.
However I am stuck on one thing. Let’s say I am making a short which I want to have a ‘film’ look to it so I shoot at 24fps, and my main project settings and ‘Master’ sequence have 24fps settings. Then there is a clip in my short film which is shot at 30fps because I want it to be super sharp, clear and smooth (landscape clip or something). If I put that clip in its own sequence at 30fps, and then drag that sequence into the Master Sequence which is at 24fps, what happens???
Am probably not being too clear, but I am confused as to how, or whether you can, have a movie which has various fps rates in the same movie, and how you export this? Because I assume that when you export you have to at one particular frame rate.
Any help is much appreciated.