-
Frame rate mistake, can I save my 70 minute grade?
So, I’ve got pretty used to round tripping and resolve setting the timeline, project frame rates automatically etc. However, for this project I have to bring in a full length Prores HQ QT of the whole film and chop it up. What I didn’t notice was that the frame rate of 25fps was not detected and my timeline is at 24 fps.
I’ve tried exporting in the deliver page but this gives me serious sync issues.
Is there a way of changing the frame rate of the timeline? Is there a way of rebuilding the timeline and having all the grades carry over?
So far my solution is to cache the whole film and set the playback and hardware rates to 25fps and play the timeline out to tape. This gets rid of the sync issue and the cuts are all synchronous with the original fcp timeline, but I wonder if there is something dodgy about doing this?
Learning by my own mistakes… 🙁