-
Time Remap and Frame Shift
So, my intention is to speed a clip up and then freeze frame.
The footage: 1080 29.97p
The Project: 720 29.97p
My process: LAYER 1 – time remap and compress a 4 min clip to 5 secs. LAYER 2 – no remap but last frame is a freeze frame.
The problem – whether layer 2 is there or not, Layer 1 is experiencing a shift in position making the cut between 1 and 2 impossible.
Something is obviously up, but what?
Any suggestions appreciated.