-
29 and 59.9 footage
Hi, I am doing a project where i will eventually output to 29.9 in avid MC. I have a lot of footage in 59.9 (some with audio). When i drop it on my project timeline it applies a motion effect and speeds it up to 200%. Should i just remove the motion effect and treat it as normal footage? Is there something i need to apple to mix those two frame rates since i need to audio? Thanks