-
Desperate for some insight switching from FCP 7
Hello All-
Long time reader/ first time poster here!
I recently was forced to switch to Avid as our client is advised by outside sources to bring his production in house using AVID. In a desperate attempt to keep the business one more year, we have switched to AVID in order to be compatible with him. (ie: sharing footage, bins, sequences, etc)
We do long format, broadcast reality television and have been delivering shows via FCP 7 for years.
Let me explain my basic offline workflow and maybe someone can explain how AVID has a faster way of doing things as this is commonly what I hear from AVID users.
Normally we have 2 main cameras on shoots–A cam an B cam. We also shoot some stuff in gopro but that normally gets tacked on at the end. For now I’m basically trying to figure out how to deal with the 2 main cameras.
We still shoot to tape in 720p (the workflow was solid so why change? {because now the client wants better image and is moving in-house to get it– Of course, being the editor I had no control over re-investment in the company and this is whats happened.. let it be a lesson to all the cheapskates})
Anyway, we capture the tapes via FCP – each tape gets its own logging bin so Cam A tape 1 gets captured to bin C1T1. Tape 2 goes to C1T2 etc etc. We deal with about 18-20 tapes per shoot. So my bins are usually C1T1-10 and then a Cam B bin with C2T1-10. All the footage is in .mov WIth me?
Now I’ve brought all that footage over to AVID and have transcoded it to DNXrLB because I’ve been watching more tutorials and reading more posts than I ever imagined and everyone says avid runs so much smoother in its native compression. Ok so thats done. all the clips look and play and act fine.
Our cameras are loosy-goosy. We dont use clap boards, we dont have a ‘sound guy’ we mic up the talent with lavs and away we go.. filming everything we can as we follow them around doing what they do. Sometimes Cam A is rolling while B is shooting broll around a location, sometimes Camera B is on the action while A changes tapes. Timecode is loosly synced but not jammed.
We begin the offline with the end in mind knowing we want to feature X, Y and Z in the show and which tapes had that footage.
I will go to Cam A. find the ‘on camera standup’ and drop that in the timeline. I’ll go to Cam B footage, find the alternate angle, find the easy sync point, and drop that quickly on the second track.. A couple frame shifts in a couple of seconds gives me 2 synced clips. I then scale the Cam B footage to the bottom corner and cut the two back and forth removing the ‘scale’ attributes on the B cam as needed. I hate multicam editing because I dont like ‘live switching’ I like to cut when I ‘need to’ and to do that properly, I need to be able to scrub around the footage quickly. lastly I’ll throw some Broll over the top from another clip, drop a music track in and viola.. done. Takes about 20 minutes to cut a minute long scene ready for broadcast.
So now, we’re switching to card based media and FCP is not going to be viable like avid or premier and since the client wants AVID im stuck.
All I can find on AVID about ‘multicam’ editing requires and arduous, time consuming process involving making edits, 3rd party software (pluraleyes?) and creating AUX TC in order to create multigroup clips that you then have to cut using multicam editing.
What was avid made for? time wasters? :p
Unless you’re working with tons of pre-editors who can sit there and add all the metadata of a Michael Bay film how is AVID faster is doing MY kind of work? Are there any other producers who have made the jump and found the tricks?
I did read about Auto-sequencing which seemed amazing but I get a sequence of lets say “Cam A tape 1” and then it creates a whole NEW sequence for “Cam B tape 1”.. I want both on the same sequence. I tried to copy and paste and that became a mess quickly.. The biggest thing for me is in FCP7 I could edit PIP so quickly and easily.. am I to understand doing so in AVID requires a FILTER?! WTF? A Filter to resize an image?! WHYYYY??? please lord help me.
I have watched NUMEROUS (50-60hrs) of creative cow, lynda.com and AVID videos explaining many of the processes but it feels like all the tutorials are for kids making soda fountain videos on youtube. 10 clips in a project with 2 angles.. When we’re dealing with hundreds of gb of footage spanning 4 days and trying to stay organized.. the 1 bin solution seems far more disorganized in terms of finding clips to sync, finding certain things that happened etc. There is so much junk and garbage in the bins in a normal project but drive space is cheap and I find some of the best moments IN BETWEEN the stuff we shoot for a segment. Sometimes parking the car on the way into the store is a funnier bit than what happened in the store and we use it.
Is there anyone out there who can relate to this style of production/editing? Is there anyone out there who can help? Anything at all will be helpful… The shows need to air 1st quarter and here is is.. end of august without a single show offlined yet.. yikes…