-
Moving sequence between projects
Hey all,
I am trying to move sequences from one project to another. I basically had the exact same project and was given a larger drive so I moved everything over and reconnected. Everything reconnected fine and the clips are online but when I copy over some of the sequences from the old drive they are all offline. I’ve tried to reconnect the sequences but with no luck. Why aren’t they just reading the clips that are online? Can you copy and paste sequences or is there another way I’m not doing? Again, the clips in the sequences match the original clips in their bin, which are online. It’s only the sequence saying everything is offline.
Thanks
Sorry, there were no replies found.