-
media manage to different codec?
Hi,
I was assigned to re-edit a piece which contains mixed codecs: Pro Ress & H264. The previous editor elected NOT to transcode half of the footage to Pro Res.The Timeline settings are Pro Res. Every time I make an edit I have to re-render. It’s counterproductive to keep going if I have to spend 2/3rds of my workday re-rendering.
What I want to do is media manage the whole project and convert it to all Pro Res. How can I do this, and will the shots relink? No slates were used, no TC. It was shot in a 7D (h264) and unknown camera for the Pro res footage.
Ideas? I need to knock this out. Thanks!