-
Convert 23.98 to 29.97 with a duplicated frame
I’m pretty sure I know the answer from doing research, but I thought I would ask…
I have a client that has footage shot at 1920×1080 23.98. She wants the master to be 1080i2997. I told her the best way is to do a hardware conversion, but she said no because of the cost. So then I recommended After Effects but it would take a long time. I showed her a sample and she wasn’t happy of how the pulldown added a blended field after 3 frames. So then she told me she can do this in Compressor with a fast setting that would duplicate the fourth frame- similar to what FCP does when you just drop a 2398 clip in a 2997 sequence. She liked the cleaner look from this conversion when we stepped through each frame.
The truth is , when we play back on the monitor, but versions look fine. Can anyone help on deciding whether the compressor duplicate a frame method will work for broadcast?
Thanks