-
FCP Project backup and Media Management
Hello everyone, this is my first post on the site and I’m happy to be a new member of the community! I’ve been trolling the site for a long time and have always found it quite useful.
So I have been banging my head against the wall for sometime now trying to figure out the best management practices for backing up FCP projects and the original P2 media the projects were shot on. Right now our system is two pronged: Original P2 media lives on one set of drives as a backup, and FCP projects live on another set of Drives. This was all fine and dandy the first year or so of the P2 era but now we are entering the fourth year of shooting entirely on P2 and the hard drives are starting to stack up. The longer this practice gos on the more expensive and less efficient it gets. I realize this is mostly a personal opinion but what are some better options for media management?
One thought I have had is eliminating the long term storage of P2 media and only keeping it while the project is active. Then once the show is over delete the p2 media and do a proper fcp media manager backup of the project. Then duplicate that onto a second drive. This would leave us with the long term storage solution of having the fcp project backed up on 2 drives while also eliminating unused “junk” footage that in some cases could add an additional 60% to the size of the project.
So, thank you for reading my novel and I hope there are some ideas/thoughts out there!