29.97 sequence to 59.94
I am working with a sequence in an online session that was delivered to me in 720 29.97 with XDCAM footage at 23.98 and Prores footage at 29.97. Final delivery is Digibeta 29.97.
Everything plays fine in the sequence, but the final credit scroll looked very jittery. If I change the settings to 59.94 the scroll looks fine but the timings for everything else are totally off.
To change from 29.97 to 59.94 I created a new sequence and copied and pasted from old to new. Now all the cuts are half as long as they should be (makes sense if they were playing back at 30 frames and now are played at 60). My 23 minute show is now 12 minutes long and obviously audio does not sync.
My one option is to adjust the timing of just what the credit scroll is over and do an insert after the main output but I would like to find a way to make it work so that everything is at 59.94 as this is the first of 13 shows that need finishing.
Anyone know of a way to change to 59.94 and keep the shots at the correct timings?
Thanks,
Mike