-
“Send to -> Shake” issue
To start off, in capturing and logging, I used the method of capturing the entire tape then subclipping to the take numbers. This seemed to be an easier and quicker way. However, there is one issue I’ve come across. When I sent a clip from the sequence in the timeline to Shake, the timeShift properties were way off. This is due to the number calculations set to the subclip and not the main clip. Is there a way to fix this without having to manually set the frames for timeShift, inPoint, and outPoint in Shake to match the position of the in and out points on the main clip on Final Cut Pro?
-Bob
Salt: Contains salt.