Creative Communities of the World Forums

The peer to peer support community for media production professionals.

Activity Forums Apple Final Cut Pro Legacy 23.98/29.97 HD workflow issue

  • 23.98/29.97 HD workflow issue

    Posted by Ed Yonaitis on May 15, 2006 at 4:59 pm

    Hello-

    I am currently working on a project that was shot on the Cinealta HD camera at 23.98 fps. Before bringing the footage into FCP HD, we dubbed all the tapes to DVCPRO at 29.97 fps; this is what we imported into Final Cut. The project is picture locked and we’re ready to res up back to HD quality; however, I’m a bit new at this procedure and I’m undergoing a few issues with this process:

    My sequence timebase so far has been 29.97 fps, since I’ve been working from DVCPRO dubs. I plan on resing up using the AVID Nitris system (this is my only option), so I’ll need to export a cut list. Thing is, I figure I’ll need to create a 23.98 sequence of my project so that the cut list properly matches the timebase of my HD tapes. I’ve tried doing this with CinemaTools but with little results. Is there a way to create a 23.98 fps copy of my final sequence without screwing up all my edits? Also, once I have this problem resolved, could anyone tell me the exact settings to export an EDL so that my footage will be properly batch captured using the Nitris system?

    Thanks,

    -E

    Ed Yonaitis replied 20 years, 3 months ago 1 Member · 0 Replies
  • 0 Replies

Sorry, there were no replies found.

We use anonymous cookies to give you the best experience we can.
Our Privacy policy | GDPR Policy