-
59.94 to 29.97 to 59.94
My question is this:
Is there a negative result when bringing in 59.94 source material into a 29.97 sequence and then exporting back to 59.97?
I’m working for a studio who requires all media to be exported in 59.94.
For the most part, all source material is brought in 59.94.But with such a high amount of material, along with the AJA setup, began experiencing major issues.
The technicians recommended editing this way (29.97 sequence) and we haven’t had a major issue since.Now I’m being told I need to go back to editing in 59.97 sequence.
So back to my question. Is will editing in this 29.97 workaround produce any negative or different results?
Thank you,