-
Using Dynamic Link with Twixtor
Ok so,
I have a premier project that is set to export at 23.976. I have footage I shot at 59.94. I have twixtor for after effects.
Step 1) I import footage into premiere.
NOW should I first interpret the 60p to 24p, then dynamic link the clip to after effects to apply twixtor?
Or
Should I just drop the 60p into 24 timeline and then dynamic link it without interpreting first?