Activity Forums VEGAS Pro Can be done automatically in sequence Vegas as in premiere?

  • Can be done automatically in sequence Vegas as in premiere?

    Posted by Boris Rivas on September 30, 2010 at 11:08 pm

    Hi I have that concern if Vegas can be done automatically in sequence and Premiere Pro ,Because sometimes I have over 50 clips to edit and I will not manule clip clip by changing the measure to suit the project , Or activity in order not only that flashes through

    Boris Rivas replied 15 years, 11 months ago 4 Members · 6 Replies
  • 6 Replies
  • Dave Haynie

    October 1, 2010 at 11:32 am

    Not quite sure what you’re after here. Vegas takes clips in any format, any frame rate, all on the same timeline, regardless of the project settings.

    In fact, project setting is rather like a default — you’re not held to the project settings, the end result is based on what you select to render.

    Frame rate conversion is pretty smart, but can be improved by using supersampling. I used this years back to convert an NTSC video to PAL… the result was significantly better than I got from a number of different dedicated frame rate conversion tools on the market at the time. This can be slow (back then, it was 8 days of rendering, but that was on a 1GHz Athlon XP system… guess that was quite some time ago).

    Anyway, Vegas was one of the very first NLEs to allow mixing of any sort of clips together on the same timeline. Today, it remains among the best at this task.

    -Dave

  • Boris Rivas

    October 1, 2010 at 1:18 pm

    Well thanks but it is not the answer I expected anyway I will continue investigating

  • Stephen Mann

    October 1, 2010 at 5:06 pm

    Your question makes no sense to me. What is it that you are trying to do?

    Steve Mann
    MannMade Digital Video
    http://www.mmdv.com

  • Boris Rivas

    October 2, 2010 at 9:56 pm

    Let's see if I have captured many clips every time I pause my video camera recording …Not have many clips? Then each of the videos I have to reduce interlace flicker no?? So that when I skip rendered image of both fixed and moving is not so??Then if I have 50 clips are too many to make one at a time, That is my question if I can do as a group to check the box to reduce interlace flicker one by one …I hope to answer

  • Theo Van laar

    October 2, 2010 at 10:41 pm

    To add the REDUCE INTERLACE FLICKER to many events at the same time, select the first event, activate REDUCE INTERLACE FLICKER, copy this event, select all the other events, richt-click on your mouse end select PASTE EVENT ATTRIBUTES.

    Theo

  • Boris Rivas

    October 3, 2010 at 1:16 pm

    Theo thanks that what I was looking esra…